Expedient Additive Construction for Horizontal Construction Missions (ME2022_0028)
Active005161-00001A
$7.5M
Anticipated total
$7,510,564
—
Obligated to date
2022
Start
Sep 30, 2022
2028
End
Jun 22, 2028
Abstract
No abstract in the source data.
Award period
72% elapsed · ends Jun 22, 2028
Related awards
- Large-scale testing for detecting changes in track modulus with low-cost sensors installed on rolling stock$9KU.S. DOT-Federal Railroad Administration · 2026 · Same investigator
- Examination of the Strength and Dilatancy of Granular Materials using 3D Printed Soil$76.4KNational Science Foundation · 2015 · Same investigator
- EXAMINATION OF METAL POWDER BEHAVIOR DURING ADDITIVE MANUFACTURING USING DISCRETE ELEMENT METHOD SIMULATIONS$340KU.S. Department of Commerce-NIST (National Institute of Standards & Technology) · 2014 · Same investigator
- DYNAMIC IN-SITU RESPONSES AND LIQUEFACTION OF GRAVELLY SOIL DEPOSITS$30KNational Science Foundation · 2025 · Same investigator
- A Mechanistic-Phenomenological Investigation of Fouled Ballast to Support in Situ Identification of Fouling$299.6KU.S. DOT-Federal Railroad Administration · 2022 · Same investigator
- Development and Assessment of a Pore Water pressure and Matric Suction Sensor: Laboratory Strength Testing and Field Substructure Monitoring$204.9KU.S. DOT-Federal Railroad Administration · 2022 · Same investigator
Investigators
- Michelle L. BarryPrincipal Investigator · U of A
Sponsor
Federal
Lead unit
University of Arkansas